闺蜜和我被黑人4p到惨,男人放进女人阳道视频观看,亚洲av无码成人精品区日韩,欧美黑人又粗又大的性格特点

濟(jì)南蓬發(fā)建材有限公司為您提供臨邊護(hù)欄、木工防護(hù)欄、工程圍擋等相關(guān)信息發(fā)布和相關(guān)資訊,敬請關(guān)注!
新聞
聯(lián)系我們
咨詢電話
15866735826

聯(lián)系:張經(jīng)理

手機(jī): 15866735826

郵箱: 394441862@qq.com

網(wǎng)址:http://www.diaoxx.com/

地址:山東省濟(jì)南市章丘圣井工業(yè)園

當(dāng)前位置: 首頁 > 新聞中心 > 行業(yè)動態(tài)

鋼筋加工棚的8點(diǎn)安裝事項

來源:http://www.diaoxx.com/   發(fā)布時間:2023-02-17

鋼筋加工棚是施工現(xiàn)場鋼筋調(diào)直、彎曲和焊接的場所。鋼筋加工棚我們來看看是怎么裝的。
The reinforcement processing shed is the place for reinforcement straightening, bending and welding at the construction site. Let's see how to install the reinforcement processing shed.
1、埋設(shè)預(yù)埋件(預(yù)埋件包含在單柱鋼棚內(nèi),雙柱安裝使用膨脹螺絲)
1. Embedded parts (embedded parts are included in single-column steel shed, and expansion screws are used for double-column installation)
2、將主梁與立柱連接器對接,(不要擰14個螺絲),鋼筋加工棚先將斜撐安裝在上斜撐上(用14個螺絲)。否則,支架的孔沒有對齊。
2. Connect the main beam with the column connector (do not tighten 14 screws), and install the diagonal brace on the upper diagonal brace (use 14 screws) in the reinforcement processing shed. Otherwise, the holes of the bracket are not aligned.
3、安裝主梁(單柱主梁為140工字鋼和50方管焊接框架,雙柱主梁為50方管焊接框架)與柱之間的連接件(14個螺釘)。
3. Install the connections (14 screws) between the main beam (140 I-beam and 50 square tube welded frame for single-column main beam, and 50 square tube welded frame for double-column main beam) and the column.
4、用叉車或吊車將立柱吊起安裝,間距3米(單柱單柱為200工字鋼,雙柱為100方管)。鋼筋加工棚安裝時,確保立柱的腰線在中間3米。方管柱底盤通過20*180膨脹螺栓與預(yù)埋件連接,H型鋼柱。
4. Use a forklift or crane to lift and install the columns with a spacing of 3 meters (single column and single column are 200 I-beams, and double columns are 100 square tubes). When installing the reinforcement processing shed, ensure that the waist line of the column is 3 meters in the middle. The square pipe column chassis is connected with the embedded parts through 20 * 180 expansion bolts, and H-shaped steel column.
鋼筋加工棚
5、安裝側(cè)梁(50方管焊接框架),兩邊用10×12螺釘,中間用10×18螺釘。
5. Install the side member (50 square tube welded frame) with 10 on both sides × 12 screw, 10 in the middle × 18 Screw.
6、安裝檁條,底層6個2.99米鉆尾,鋼筋加工棚4個2.94米夾角鐵,裝上。
6. Install purlins, six 2.99m drilled tails at the bottom, and four 2.94m angle iron clips at the top of the reinforcement processing shed, and install them.
7、設(shè)置彩鋼屋面,彩鋼板尺寸為1.14*3.0米,中間每隔3米,在柱的左右兩側(cè)放置三塊彩鋼板,鋼筋加工棚彩鋼板通過鉆尾絲與下檁條連接。
7. The color steel roof is set. The size of the color steel plate is 1.14 * 3.0m, and three color steel plates are placed on the left and right sides of the column every 3m in the middle. The color steel plate of the reinforcement processing shed is connected with the lower purlin through the drilling tail wire.
8、四面安裝廣告布,用鉆尾絲打邊梁和主梁。
8. Install advertising cloth on all sides, and punch the side beam and main beam with drilling thread.
鋼筋加工棚的施工規(guī)范是日常建筑施工中必不可少的。這種規(guī)范可以給我們帶來放心,保證建筑的牢固性。更多相關(guān)內(nèi)容就來我們網(wǎng)站http://www.diaoxx.com咨詢!
The construction specification of reinforcement processing shed is indispensable in daily construction. This kind of specification can give us reassurance and ensure the firmness of the building. Come to our website for more relevant content http://www.diaoxx.com consulting service

18款禁用免费安装的软件app| 免费看大片视频| 久久久久夜色精品国产明星| 老太bbw搡bbbb搡bbbb| 精品人人搡人妻人人玩a片| 精品国产乱码久久久久久人妻| 高h禁伦餐桌上的肉伦np影片| 一本加勒比hezyo东京热高清| 亚洲国产精华液2020| 试看20分钟做受| 无码人妻久久一区二区三区不卡| 丝袜美腿一区二区三区| 夜夜嗨av一区二区三区| 人妻丰满精品一区二区a片| 狠狠色噜噜狠狠狠777米奇小说| 日本亚欧乱色视频| 顶弄激情出轨h| 成人免费无码成人影院日韩| 玩弄japan白嫩少妇hd小说| 99久久国产极品蜜臀av酒店| 中文字幕| 西西大胆国模人体艺| 美国式禁忌| 色欲av人妻精品麻豆av| 又黄又爽的无遮挡免费视频人妖| 国产精品成人久久久久久久| 国产亲妺妺乱的性视频播放| 国精品人妻无码一区二区三区牛牛| 大肉大捧一进一出好爽视频| 老扒夜夜春宵第二部的| 日本无翼乌邪恶彩色大全| 国产无套白浆一区二区| 久久久亚洲精品无码| 9孩岁女精品╳片| 国产猛男猛女超爽免费视频| 精品人体无码一区二区三区| 亚洲色婷婷一区二区三区| 重口老太大和小伙乱| 女人扒开腿让男人狂桶30分钟| 中文字幕无码av波多野吉衣| 日韩中文字幕区一区有砖一区|